CAP-DECK Economics

HOME > Construction > cap_deck > CAP-DECK Economics

Construction Cost Reduction of 20-30% (Uses fewer steel frames)

Basic cost reduction (20-30% fewer steel frames used compared to the basic reinforced concrete structure)
Cost reduction for steel frame fireproofing protection (a decrease of about 70% because only the bottom flange requires fireproofing protection)

Construction Time Reduction of 30-40%

Reduce steel frame construction time (30-40% decrease because small beams are not needed)
Reduce the number of moving steel frames and decks (About 2-3months reduction)

Story Height Reduction of about 15-25%

Possible to save 25-40cm per each story (Possible to add 1 floor for about every 5 to 10 floors)

Others: Use fewer stud bolts and fireproof protections on the steel frames